Party Wall Act Checker

Find out in about a minute whether your building work needs a party wall notice, which notice it is and how far ahead you must serve it.

  • Free to use
  • Headline result with no sign-up
  • Based on the Party Wall etc. Act 1996
  • Rules last checked 26th November 2026

Step 1 of 3

Where is the property and what are you doing?

The Act covers England and Wales only.
Tick all the work you plan

A party wall stands astride the boundary, or stands on one owner's land but separates two owners' buildings.

Party Wall Act Checker: do you need a party wall notice?

In England and Wales you must serve a notice on your neighbour before you work on a party wall, build a new wall on the boundary line, or dig near their building below their foundations. Party wall work needs at least two months' notice; a new boundary wall or an excavation needs at least one month's. Minor jobs such as drilling for shelves usually need none.

How to use this calculator

Tick the work you plan, add the distance and depth of any digging and, if you like, your start date. The headline result is free: whether you need a notice, which one, and the latest date to serve it. Add your details to unlock the full working, the rules for your case and a free planning report from our team.

The Party Wall Act rules in plain English

Work to an existing party wall (section 2 and section 3)

Section 2 of the Party Wall etc. Act 1996 lists the work you have a right to do to a party wall or party structure. It includes cutting into it (for example for steel beams), raising, underpinning or rebuilding it, cutting away chimney breasts, and cutting into a neighbour's wall to fit flashing. Under section 3 you must serve a party structure notice at least two months before the work begins. The notice stops having effect if the work has not begun within 12 months of the day it is served and is not carried on with due diligence. A notice is needed even where the work will not go past the centre line of the wall.

A new wall at the boundary (section 1)

If the boundary line is not built on, or only has a fence or a wall belonging to one side, serve a notice at least one month before you build a wall on or up to the line. You can build astride the line only if your neighbour agrees in writing within 14 days; otherwise the wall stands wholly on your land, at your expense. Footings may go under their land, but you pay for any damage.

Digging near a neighbour's building (section 6)

You must serve a notice of adjacent excavation at least one month before you start if you will dig:

  • within 3 metres, measured flat, of any part of a neighbour's building or structure, and deeper than the bottom of their foundations, or
  • within 6 metres of it, where your dig will meet a line drawn downwards at 45 degrees from the bottom of their foundations towards your dig.

The notice must say whether you will underpin or protect their foundations, with plans and sections of the dig. It also lapses if the work has not begun within 12 months.

What happens after you serve a notice

For a party structure notice or an excavation notice, your neighbour can agree in writing. If they do not agree within 14 days, a dispute is treated as having arisen (sections 5 and 6), and it is settled by one agreed surveyor or by a surveyor for each side (section 10). For a new wall at the boundary, silence is not a dispute: the wall must stand wholly on your land. You can start earlier than the notice period only with your neighbour's written agreement. As the GOV.UK guidance puts it, your neighbours cannot stop you from making changes that are within the law, but they can affect how and when the work is carried out.

Assumptions and limits

  • England and Wales only. The Act does not apply in Scotland or Northern Ireland.
  • The excavation test uses the nearest edge of your dig at its full depth. Where your dig sits exactly on the 45 degree line we treat it as meeting the line.
  • Minor work is treated as needing no notice, as the explanatory booklet suggests, unless it could affect the strength or support of the wall.
  • The start date working uses calendar months and does not allow time for posting the notice.
  • It does not cover special (reinforced) foundations, which need written consent to go on a neighbour's land, or work under a dangerous structure notice.
  • A party wall notice is not planning permission or building regulations approval.

Frequently asked questions

Do I need a party wall agreement for a loft conversion?

Usually yes, if steel beams will be set into the party wall, because cutting into a party wall is section 2 work. You need to serve a party structure notice at least two months before the work begins. The "agreement" is either your neighbour's written consent or, if they do not consent, a surveyor's award.

Do I need a party wall notice for a rear extension?

It depends. A new wall on or up to the boundary, or foundations dug within 3 metres of a neighbour's building and deeper than theirs (or within 6 metres where the 45 degree rule is met), needs one month's notice. Cutting into their wall for flashing needs two months'.

What happens if my neighbour does not reply to the notice?

For a party structure notice or an excavation notice, if your neighbour does not agree in writing within 14 days, a dispute is treated as having arisen and is settled by an agreed surveyor or a surveyor for each owner. For a new wall at the boundary, silence is not a dispute: if you wanted to build astride the line, you must build wholly on your own land, and you can start once the month has passed.

Do I need a party wall surveyor?

Not if your neighbour agrees in writing. A surveyor is needed only if there is a dispute. The explanatory booklet says the building owner usually pays the costs of the award, including the neighbour's surveyor, where the work is solely for the building owner's benefit.

Do I have to give my details to use the calculator?

No. The headline result is free with no sign-up. You only add your details if you want the full breakdown and a free planning report from our team.

Related guides and tools

Last checked 26th November 2026. Sources: Party Wall etc. Act 1996, GOV.UK party walls guide and explanatory booklet.

This tool gives a guide only, based on the rules published at the date above. It is not professional advice, and your council has the final say.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.