Find out in about a minute whether changing the use of a building in England needs planning permission, prior approval or neither.
How we worked it out: route, protected areas, Article 4, floor space, use history.
Conditions you must meet. Prior approval matters. Next steps for your building.
Enter your details and we will show you straight away:
Our form did not load. Get a free planning report or book a free advice call instead.
Prefer to talk it through? Book a free advice call or call 0800 912 5346. We never share your details.
In England, changing the use of a building needs planning permission if it is a material change of use, unless the old and new uses are in the same use class or a permitted development right covers the change. Some permitted changes, such as a shop to a home under Class MA, still need the council's prior approval.
The Use Classes Order 1987 sorts uses into classes, such as B2 (general industrial), B8 (storage), C3 (homes), C4 (small HMOs for 3 to 6 people) and E (shops, cafés, offices, gyms, clinics and light industry). Uses in no class, such as pubs, takeaways, betting offices, launderettes, casinos and arcades, are sui generis. The Planning Portal guide lists them all. Under section 55 of the Town and Country Planning Act 1990, a change within the same class is not development, and using one house as two or more homes is a material change of use.
Part 3 of Schedule 2 to the GPDO 2015 allows some changes without a planning application. This checker covers Class A (casino, betting office, pay day loan shop or takeaway to Class E, after written notice), Class AA (pubs with and without expanded food), Class G (Class E to a mixed use with up to 2 flats), Class I (B2 to B8, up to 500 m²), Class L (house to small HMO and back), Class M (launderette, betting office, pay day loan shop or takeaway to homes, up to 150 m²), Class MA (Class E to homes after 2 years of Class E use, with no size limit since 5 March 2024), Class N (arcade or casino to homes, up to 150 m²) and Class Q (agricultural buildings to up to 10 homes). Classes G, M, MA, N and Q need prior approval.
Class P (storage to homes) only applied where the prior approval date was before 10 June 2019. With prior approval, the council looks only at the matters the class lists. You cannot start until it says approval is not needed or gives it, or 56 days pass without a decision.
An Article 4 direction (GPDO article 4), a planning condition on the use or an unlawful existing use (article 3) rules out permitted development. Classes M, MA, N and Q also exclude listed buildings, SSSIs and some protected areas, and new homes must meet the nationally described space standard.
Related: lawful development certificates, planning permission costs, pre-application advice, our Cradley micro pub case, the space standards calculator, planning fee calculator, planning timeline calculator and 4 and 10 year rule checker.
Yes, if it is a material change of use and no permitted development right covers it. A change within one use class, such as a shop to an office (both Class E), is not development.
Often, under Class MA, but you must get prior approval first. The building needs at least 2 years of continuous Class E use, and Class MA does not apply to listed buildings, SSSIs, National Parks, National Landscapes, the Broads or World Heritage Sites.
A house (C3) to a small HMO for 3 to 6 people (C4) is permitted development under Class L, unless an Article 4 direction removes it. A large HMO for 7 or more is sui generis, with no permitted development right, so a material change needs planning permission.
The council has 56 days. If it does not decide in that time, you can start. Under Classes M, MA, N and Q, you must then finish within 3 years of the prior approval date.
No. Your headline result, including whether you need planning permission and which route applies, is free with no sign-up. Your details are only needed for the full breakdown and a free planning report from our team.
Last checked 25th November 2026. This tool gives a guide only, based on the rules published at the date above. It is not professional advice, and your council has the final say.